Utility construction inspection form
A clean, usable inspection form for wet and dry utility construction — water, sewer, storm, gas, electric, and conduit. Fill it in below and download a copy, or download it blank to print and complete in the field.
How to use it
Use it as each utility run is installed and before it is backfilled, to record what the inspection actually confirmed — trench and cover, bedding, joints, testing, compaction, and restoration — and to flag exceptions before the stage is covered up. Pair it with the construction draw inspection form for the draw itself. The form captures inspector- and contractor-reported information; it is not a satellite observation.
The form records the visit. What about between visits?
An inspection confirms a point in time. Ground Stasis watches the site by satellite in between and flags when it goes unusually quiet — so the gap between inspections stops being a blind spot. Prove it on one site for $9.
Related: draw inspection form · draw inspection checklist · loan monitoring checklist
Common questions
What is a utility construction inspection form?
It is the document an inspector or contractor uses to record what was confirmed when a utility was installed: the segment or station, the utility type and material, trench depth and depth of cover, bedding, joints, separation from other utilities, any pressure/mandrel/compaction testing, surface restoration, supporting documentation, exceptions, and a sign-off.
Is this utility inspection form free to download?
Yes. Fill it in on this page and download a clean copy, or download it blank to print and complete in the field. It works independently of Ground Stasis, and nothing you type leaves your device — the file is generated in your browser.
What should a utility construction inspection cover?
For wet utilities (water, sewer, storm): line and grade, bedding and haunching, joints, depth of cover, and the required test — pressure for water, mandrel/deflection and often a leakage test for gravity sewer. For dry utilities (electric, gas, telecom, conduit): depth, separation and clearances, warning tape, and backfill compaction. Across both: an 811 locate before digging, density/compaction on backfill, and surface restoration.
How does this relate to construction loan monitoring?
Underground utilities and sitework are early, high-value draw stages, and once they are backfilled they are invisible — so the inspection record is the evidence. The fields here are inspector- and contractor-reported; that is distinct from a satellite observation, which is an independent remote signal of whether the site is physically changing between inspections. Ground Stasis keeps reported and observed clearly separate.
New here? Start with the free monitoring checklist or the gap calculator. Ground Stasis is an independent monitoring signal — it doesn’t replace inspections, and it never claims a project has stopped.