Free calculator
Construction Monitoring Gap Calculator
Inspections are periodic; risk isn’t. This measures your monitoring gap — the stretch between site checks where no one is independently confirming the project is physically moving.
Enter a last-inspection date to see your monitoring gap.
Where Ground Stasis fits
The gap is the risk. Ground Stasis watches the gap.
Between inspections you're relying on borrower reporting alone. Ground Stasis fills that stretch with satellite observations — comparing the site over time and flagging when physical change goes unusually quiet, so the gap stops being a blind spot.